• This is default featured slide 1 title

    Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

  • This is default featured slide 2 title

    Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

  • This is default featured slide 3 title

    Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

  • This is default featured slide 4 title

    Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

  • This is default featured slide 5 title

    Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

TET Assam 2013-14 for Higher Secondary Schools announced

TET Assam 2013-14 is announced for the Higher Secondary level and the next Teachers Eligibility Test(TET) in Assam is scheduled to be held on 19th November 2013. It is known that the teacher’s vacancy in the state across all the Govt. schools would be filled by March 2014. This upcoming TET in Assam will be meant for regular appointment of teachers and will be conducted towards the year-end.

For more details for Appointment : Click Here
Share:

Cotton College State University, Guwahati recruitment for Non-Teaching Staff June 2014

Cotton College State University is pleased to release advertisement for the following:
A) RECRUITMENT OF NON-TEACHING POSITIONS
1. Academic Registrar
2. Assistant Controller of Examinations
3. Store  Officer
4. Junior Assistant
5. Administrative helper (Grade IV)
6. Executive engineer
7. Junior Engineer (Civil)
8. Junior Engineer (Electrical)
9. Electrician
10.Plumber
11. Technical Assistant (Jr.)

Last date for submission of application form for non-teaching posts / Expression of Interest for Legal Counsel/ Expression of Interest for preparation of Asset Register/ Quotation for providing Security Services is
14 July 2014
HELPLINE Nos. 0361-2733530 / 2733513.
Email: registrar[AT]ccsu.ac.in


Share:

Assam CEE 2014 Counselling

Latest: Assam Combined Entrance Examination (CEE) 2014 result has announced on June 5, 2014 at 2 PM and now the selected candidates are waiting for the Assam CEE 2014 Counselling. Candidates can check the further and most important details related to Assam CEE 2014 Counselling and Counselling process below:
Assam CEE 2014 Counselling
We all are expecting that the Assam CEE 2014 counselling process will be started in the month of June, 2014. The selected participants in Assam CEE 2014 can proceed for counselling process just by filling the form B (engineering programs). Candidates can take the admission in engineering programs in Assam state after completing the counselling process. They can easily download the Assam CEE 2014 counselling form B from here.
Share:

Special Category (SC, ST) TET Result 2014

Assam Teacher Eligibility Test (TET) Advertisement Notification 2014 – www.tetassam.com | ATET Notification2014, Examination Date, Syllabus. Secondary Education Department  Assam will Conducts TET Examination 2014, Secondary Education Department will Published A Notification for TET Exam 2014, Eligible Candidate Apply Online Application Form 2014, TET 2014 Examination Date Will Announced by the Secondary Education Department Assam.

Official Websites: Click here
Share:

Naranarayan Setu

Naranarayan Setu (Assameseনৰনাৰায়ণ সেতু) (IPA - nɑ:rəˈnərɑ:jənə/nɑ:rəˈnəraɪjənə ˈseɪtu:) is the third bridge to have been constructed over the Brahmaputra River inAssamIndia. It is a double-deck bridge with a railway track on the lower deck and a road on the upper deck. It has a length of 2.284 kilometres and connects Jogighopa, a town of Bongaigaon District on the north with Pancharatna, a town of Goalpara District on the south.The bridge was inaugurated on April 15, 1998 by Atal Bihari Vajpayee, the Prime Minister of India at that time. The approximate cost of construction of this bridge is Rs. 301 crore.
Share:

About Evently

Pellentesque vitae lectus in mauris sollicitudin ornare sit amet eget ligula. Donec pharetra, arcu eu consectetur semper, est nulla sodales risus, vel efficitur orci justo quis tellus. Phasellus sit amet est pharetra, sodales ipsum et, sodales urna. In massa nisi, faucibus id egestas eu, fringilla

Popular Posts

Recent Posts

Pages